Change severity is a judgment of how hard a change will be for a particular group to absorb. Change severity depends on how different the new way is from the current one, how many people are affected, how often they meet the change in daily work, and the emotional and practical costs it carries for them.

Quick facts

Type
Practice (assessment)
Origin
Change practice, informed by research on how personal job impact shapes commitment to change (Fedor, Caldwell & Herold, 2006)
Used when
After the impact assessment, to decide how much support each group needs
Related models
Change impact assessment, Bridges' transition model, the change curve
Exam relevance
APMG CM Foundation, The Work of the Change Manager (WM0202)

What is change severity in change management?

A change impact assessment shows what changes for each group: roles, processes, systems, locations. Change severity asks a different question: how hard will that change be for the people in each group to absorb?

The same change can be mild for one group and severe for another. A new booking system may be a small adjustment for occasional users and a complete change of daily routine for the team that runs it.

Research supports looking at several dimensions at once. Donald Fedor, Steven Caldwell and David Herold found that employees' commitment to a change depended on the combination of how favorable the change was for their work unit, how much the unit changed and how much their own job changed.

Assessing change severity therefore turns an impact list into a view of where people will need the most support.

What factors make a change more severe?

Practitioners commonly weigh factors such as these:

  • Scale of difference: how far the new way is from the current one in tasks, skills, tools and relationships.
  • Number affected: how many people in the group change, and how widely they are spread.
  • Frequency: whether people meet the change many times a day or once a year.
  • Emotional factors: losses of status, expertise, identity, colleagues or job security.
  • Cost factors: time, effort, learning and extra workload during the transition.
  • Other changes: how much change the same group is already absorbing.

Severity is partly subjective. Richard Lazarus and Susan Folkman's work on stress shows that people appraise a demand against their resources to cope, so the same change can feel different to two groups.

The factors of change severity are best rated with the people affected, not only by the project team.

How do you assess change severity step by step?

Brightwater Health is introducing electronic prescribing on its wards.

  1. Take the groups from the impact assessment.
  2. Rate each factor low, medium or high with representatives of each group.
  3. Combine the ratings into an overall level, and note any single factor rated high.
  4. Check what other changes are landing on the same groups.
  5. Review the ratings as the change progresses.
GroupDifferenceFrequencyEmotionalOverall
Ward nursesHighMany times a shiftMediumHigh
PharmacistsMediumDailyHigh: role in checking changesHigh
Visiting consultantsLowWeeklyLowLow

The overall level is a judgment, not a sum: one high emotional factor can outweigh several low ones.

Assessing change severity in this way gives each group a rating that the team can explain and revisit.

How should change severity shape the change approach?

Severity tells the change team where to put its effort.

  • High severity: engage the group early, involve it in design, use two-way communication, give hands-on support and allow a longer transition. Sponsors and line leaders should pay visible attention to these groups.
  • Medium severity: targeted briefings, training and support from local change agents.
  • Low severity: clear information at the right time is often enough.

At Brightwater Health, pharmacists receive early design workshops because their checking role changes, while visiting consultants receive a short briefing and a quick-reference guide.

Change severity ratings therefore stop a team from treating every group the same way.

What are common mistakes when assessing change severity?

  • Rating from the project's point of view. The team that designed the change often underrates how different it is for the people using it.
  • Counting heads only. A change that affects few people can still be severe for them.
  • Ignoring emotional factors. Loss of status or expertise rarely appears in a process design but drives reactions.
  • Ignoring cumulative change. A small change on top of three others can be the one that overloads a team.
  • Treating ratings as precise. Low, medium and high are prompts for planning, not measurements.

Assessing change severity well means rating with the people affected and revisiting the ratings as the change lands.

Change severity vs. change impact assessment: what is the difference?

Change severityChange impact assessment
QuestionHow hard will this change be for each group to absorb?What changes for each group?
ContentRatings of difference, frequency, emotional and cost factorsChanges to roles, processes, systems, locations and skills
OutputA severity level per groupA list of impacts per group
Main useDecide the intensity of support and engagementPlan the specific actions needed for each impact

The impact assessment comes first and describes the change; the severity assessment builds on it and judges how much support each group will need.

Exam focus

At Foundation level (WM0202), expect comprehension of what makes a change more or less severe for a group and why severity differs between groups. The exam uses the course text's own severity factors and terms; learn them from the official study guide rather than from the factors on this page. A common trap equates severity with the number of people affected or with the technical size of the change.

Practise this syllabus area →

FAQ

What is change severity?

Change severity is how hard a change will be for a particular group to absorb. It depends on how different the new way is, how many people are affected, how often they meet the change, and the emotional and practical costs it brings. The same change can be severe for one group and mild for another.

How is change severity different from change impact?

Change impact describes what changes for a group, such as its processes, systems or roles. Change severity judges how hard those changes will be for the group to absorb. An impact assessment lists the changes; a severity assessment uses that list to decide how much support each group needs.

Can a small change be severe?

Yes. A change that looks small in a project plan can be severe for a group if it touches their daily work, removes expertise they are proud of, or arrives on top of several other changes. Severity depends on the group's experience, not on the size of the technical change.

Who should assess change severity?

The change manager usually leads the assessment, but the ratings should be made with representatives of each affected group and their line leaders. People inside a group see emotional and practical costs that a project team often misses.

Sources

Last reviewed

ADKAR® and Prosci® are registered trademarks of Prosci, Inc. APMG International™ and Change Management™ are trademarks of APMG International. CCMP™ is a trademark of the Association of Change Management Professionals (ACMP). MBTI® and Myers-Briggs® are trademarks of The Myers & Briggs Foundation. TKI® is a trademark of The Myers-Briggs Company. VARK® is a registered trademark of VARK IP Limited. Other names may be trademarks of their respective owners. This guide is independent and is not affiliated with, sponsored or endorsed by any of these organizations.