Organizational Context & Approach

Planned vs Emergent Change

Planned and emergent change are two views of how organizations change. Planned change moves toward an end state defined in advance through a managed sequence of stages, in the tradition of Kurt Lewin. Emergent change unfolds continuously, often bottom-up, as people adjust and learn, so its outcome evolves along the way. Most real changes combine both.

Quick facts

Type
Concept (approaches to organizational change)
Origin
Planned: Kurt Lewin and organization development (1940s onward). Emergent: critiques from the 1980s–1990s, e.g. Weick & Quinn (1999), Orlikowski (1996), reviewed by Burnes (1996; 2004)
Used when
Choosing how far to fix the end state and the path of a change in advance
Related models
Lewin's three stages · Kotter's 8 steps · Agile change · Continuous change cycle
Exam relevance
APMG CM Foundation, Organizational Context & Approach (OA0202)

What is planned change?

Planned change is change that leaders decide on, design and steer toward a destination they can describe in advance. It usually follows a sequence of stages, each with its own activities.

The approach is rooted in the work of Kurt Lewin in the 1940s and the organization development tradition that followed. Bernard Burnes (2004) calls this body of work the planned approach to change. Later step models, such as Kotter's eight steps, share its logic.

Typical features are:

  • a defined end state and success criteria;
  • a sequence of stages or steps with a start and an end;
  • direction set by leaders or a sponsor, often top-down;
  • change treated as an episode between periods of relative stability.

Planned change is therefore a deliberate move from a known present to a chosen future.

What is emergent change?

Emergent change is change that unfolds continuously from many local adjustments, experiments and conversations, rather than from a single plan. Its direction is not fully fixed at the start; it evolves as people learn what works.

The emergent view grew in the 1980s and 1990s as a critique of planned models, seen as too linear for fast-changing environments. Three strands are often cited:

  • Karl Weick and Robert Quinn (1999) contrasted episodic change, infrequent and intentional, with continuous change, ongoing, evolving and cumulative.
  • Wanda Orlikowski (1996) showed, in a two-year study of one organization's use of a new information system, that significant change came from people's everyday improvisations. She called this situated change.
  • Bernard Burnes (1996; 2004) reviewed the emergent approach and argued that no single approach fits every situation.

Emergent change is therefore change that is discovered in practice rather than fully designed in advance.

What are the main differences between planned and emergent change?

Planned changeEmergent change
End stateDefined in advanceEvolves as people learn
PathA sequence of stagesContinuous, iterative adjustment
DirectionMostly top-down, led by sponsorsOften bottom-up, from local initiative
RhythmEpisodic, with a start and an endOngoing and cumulative
Role of leadersDesign and steer the changeCreate conditions, interpret and amplify what works
Typical riskRigidity when conditions shiftDrift and a lack of coherence

Planned vs emergent change is therefore a choice about how much of the future can be known in advance.

When does each approach fit best?

A planned approach fits when the desired end state can be clearly defined and the path to it is reasonably predictable, such as a regulatory deadline, an office move or a payroll system with fixed requirements.

An emergent approach fits when the environment shifts fast, when nobody can specify the end state in detail, or when the change depends on how people interpret new ways of working, such as building a more collaborative culture.

A useful test asks two questions. How clearly can we describe the end state? And how confident are we that the planned steps will lead there? The lower the answers, the more room the change needs to emerge.

Planned vs emergent change is therefore a contingency choice, not a matter of one approach being right.

Can planned and emergent change be combined?

Yes, and most real changes do combine them. A common pattern fixes the direction and the non-negotiables centrally, and leaves the detail to emerge locally.

At Brightwater Health, the board sets a fixed date to retire paper records and defines the legal and safety requirements. That part is planned. How each ward reorganizes handovers and which local shortcuts are retired are worked out by ward teams in short cycles. That part is emergent.

The change manager sequences the planned elements and sets up the feedback, pilots and forums that let the emergent ones surface and spread.

Combining planned and emergent change therefore means planning the frame and letting the content develop inside it.

What are the criticisms of planned and emergent approaches?

Critics of planned change argue that it assumes too much stability, relies on top-down direction and struggles with fast or radical change. Burnes (2004) argues that several of these criticisms misread Lewin, whose own work was participative and iterative.

The emergent approach has its own weaknesses. Reviewers note that it is a loose collection of ideas rather than one coherent method, with less practical guidance. It can also underplay situations that need a fast, centrally directed response.

Planned vs emergent change is therefore best treated as a spectrum, with each approach correcting the blind spots of the other.

Emergent change vs. agile change management: what is the difference?

Emergent changeAgile change management
What it isA view of how change happens in organizationsA way of managing change that borrows agile principles and practices
OriginOrganization research (Weick & Quinn; Orlikowski; Burnes)Agile software and product practice applied to change
Who drives itOften nobody centrally: it arises from local adjustmentA change team working in short, planned iterations
PlanningLittle advance design of the outcomePlanned in short cycles with regular review and re-prioritization

Emergent change describes how change arises; agile change management is one deliberate way to manage change iteratively, so it sits between the planned and emergent poles.

Exam focus

At Foundation level (OA0202) expect comprehension of what distinguishes planned from emergent change and of when each fits. Planned change suits a clear end state and a predictable path; emergent change suits fast-moving, uncertain conditions where the outcome evolves. A common trap describes emergent change as a sequence of stages toward an agreed end state, or as crisis-driven change led by a small team.

Practise this syllabus area →

FAQ

What is the difference between planned and emergent change?

Planned change moves toward an end state defined in advance through a managed sequence of stages. Emergent change unfolds continuously from local adjustments and learning, so its direction evolves over time. Planned change assumes the future is predictable enough to design; emergent change assumes it must be discovered.

What is an example of emergent change?

A team that starts using a new collaboration system and gradually invents new ways of sharing knowledge, without any central plan, is an example. Orlikowski (1996) described such a case, where the significant change came from everyday improvisation by the people using the system rather than from a top-down design.

Is Lewin's model planned or emergent?

Lewin's three-stage model is the classic example of planned change, and Burnes calls Lewin's work the foundation of the planned approach. Burnes also argues that Lewin's methods, such as action research, were more participative and iterative than the simple unfreeze, change, refreeze summary suggests.

When should I use a planned approach to change?

Use a planned approach when the end state can be clearly defined and the path to it is reasonably predictable, such as a regulatory deadline or a system with fixed requirements. If the outcome depends on learning and local adaptation, leave room for emergent change within the plan.

Sources

Last reviewed

Go deeper

ADKAR® and Prosci® are registered trademarks of Prosci, Inc. APMG International™ and Change Management™ are trademarks of APMG International. CCMP™ is a trademark of the Association of Change Management Professionals (ACMP). MBTI® and Myers-Briggs® are trademarks of The Myers & Briggs Foundation. TKI® is a trademark of The Myers-Briggs Company. VARK® is a registered trademark of VARK IP Limited. Other names may be trademarks of their respective owners. This guide is independent and is not affiliated with, sponsored or endorsed by any of these organizations.