Process Modeling Notations (BPMN, Flowchart, EPC, UML, IDEF0, VSM)
A process modeling notation is a set of symbols and rules for drawing processes so that every reader interprets the model the same way. Common notations include BPMN, flowcharts, EPC, UML activity diagrams, IDEF0 and value stream maps; each was designed for a different audience and question, so choosing one depends on the model's purpose.
Quick facts
- Type
- Modeling standards and conventions
- Origin
- Process charts (Gilbreths, 1921), ANSI and ISO flowchart symbols (ISO 5807, 1985), IDEF0 (US Air Force, 1970s–1981), EPC (1992), UML (1997), BPMN (2004), value stream maps (1999)
- Most widely used standard
- BPMN, maintained by the Object Management Group and published as ISO/IEC 19510
- Key idea
- Choose the notation for the audience and the question, not by habit
- Related concepts
- Purpose of modeling, modeling levels, BPMN, swimlane diagrams, SIPOC
- Reference
- BPM CBOK® v4, knowledge area 2 (Process Modeling)
- Exam relevance
- CBPP® 2026 blueprint 2.2 Process Modeling Notations
What is a process modeling notation?
A process modeling notation is a visual language: a defined set of symbols, what each symbol means and rules for combining them. A notation lets a model drawn by one person be read correctly by another, months later, in another department.
Notations differ in three ways that matter in practice:
- What they emphasize: the sequence of activities, the events between them, the functions and their inputs, or the time and waste in a flow;
- How precise they are: some allow informal use, others define every symbol so strictly that a model can be checked or executed by software;
- Who they were built for: business readers, systems engineers, software developers or Lean teams.
No notation is complete. Each one leaves things out on purpose so that its main message stays readable. That is why organizations often use more than one: a SIPOC to agree the scope, a swimlane diagram or BPMN model for the flow, a value stream map to study time and waste.
A process modeling notation is a shared vocabulary; its value comes from everyone reading it the same way.
What are the main process modeling notations?
| Notation | Origin | What it shows best | Typical users |
|---|---|---|---|
| Flowchart | Industrial engineering, then computing; symbols standardized by ANSI and ISO 5807 | Simple sequences and decisions | Everyone; procedures and training |
| BPMN | Business Process Management Initiative (2004), now maintained by the Object Management Group | Flow, events, decisions and collaboration between participants, from descriptive to executable | Business analysts and process teams, also developers |
| EPC | Scheer's research group, Saarland University (1992) | Alternating events and functions joined by logical connectors | Enterprise systems and reference-model work |
| UML activity diagram | Software engineering, standardized by the Object Management Group | Behavior linked to system design | Software and systems analysts |
| IDEF0 | US Air Force ICAM program; NIST FIPS 183 (1993) | Functions with their inputs, controls, outputs and mechanisms | Systems engineering, defense, manufacturing |
| Value stream map | Toyota practice, popularized by Rother and Shook (1999) | Material and information flow, inventory, processing and waiting time | Lean practitioners |
The table is a simplification. Each notation has dialects and extensions, and teams often borrow ideas across them; swimlanes, for example, appear in flowcharts, UML and BPMN alike.
These process modeling notations overlap, but each answers a different question best.
How do you choose a process modeling notation?
Start from the uses the models must serve, then pick the notation that serves the most demanding one without excluding the others.
- List the purposes. Informing staff, analyzing problems, simulating, automating and auditing ask for different precision.
- Identify the audiences. Frontline staff, managers, analysts and developers read models differently.
- Check the longest-lived use. If some processes will later be automated, a notation that also supports executable models avoids remodeling them from scratch.
- Agree the conventions. A notation alone does not guarantee consistent models; naming rules, symbol subsets and levels must be agreed too.
- Plan the views. Decide what each audience will see.
At Larchfield Logistics, the process office needs models that warehouse staff can follow, that analysts can study and that some day may drive automated exception handling. It chooses BPMN as the master notation because the same standard spans simple descriptive diagrams and executable models. For warehouse staff, it publishes views that use only a handful of symbols: tasks, a start and an end, simple decisions and lanes. Lean teams still draw value stream maps during improvement events, as a complement rather than a replacement.
Choosing a process modeling notation is a decision about purposes and audiences, recorded in modeling conventions.
Should one notation serve every audience?
Usually, one rigorous master notation with simplified views works better than either extreme.
Switching the whole program to informal flowcharts makes models easy to read but loses the precision analysts and developers need, and anything later automated has to be remodeled. Training every employee in the complete specification of a rich notation is costly and unnecessary; most readers need only a small part of it.
The common middle path is:
- keep one master model in the rigorous notation, owned and maintained under conventions;
- define a reduced symbol set for business readers, for example the Descriptive conformance sub-class defined in BPMN 2.0, which uses only the most common elements;
- publish audience-specific views, such as a one-page overview for executives and a role view for performers, all derived from the same master.
When a different question arises, such as how much of a lead time is waiting, a specialized notation like a value stream map is added for that analysis without replacing the master.
A single process modeling notation can serve many audiences when its views are tailored and its master model stays rigorous.
What are the limitations of process modeling notations?
Notations give teams a shared language, make models comparable and, in the richer standards, allow models to be checked and executed. Their limits are just as practical:
- Precision is not correctness. A model can follow every rule of the notation and still describe the wrong process.
- Rich notations are hard to read. The more symbols a notation offers, the more readers it loses; most models use only a small fraction of the available elements.
- Each notation has blind spots. Flow notations show sequence but not time or waste; value stream maps show time but not detailed decision logic; IDEF0 shows functions and constraints but not sequence.
- Notation wars waste time. Debating the right symbol rarely improves a process; agreeing conventions and moving on usually does.
- Some work is not a sequence. Case-based, judgment-heavy work fits poorly into strict flow notations.
These limits argue for choosing deliberately and combining notations where needed, not for avoiding standards.
Process modeling notations are tools for communication and analysis; they work best when chosen for a purpose and used with agreed conventions.
BPMN vs. other process modeling notations: what is the difference?
| BPMN | Flowchart | EPC | IDEF0 | Value stream map | |
|---|---|---|---|---|---|
| Focus | Flow, events, decisions and collaboration | Simple sequence and decisions | Events and functions in alternation | Functions and their constraints | Material and information flow, time and waste |
| Shows sequence? | Yes | Yes | Yes | Not as such | At a high level |
| Shows time and waiting? | Only through attributes or simulation | No | No | No | Yes, on its timeline |
| Executable? | Can be, at the executable level | No | Not directly | No | No |
| Typical audience | Business and technical | Everyone | Enterprise systems teams | Systems engineers | Lean teams |
BPMN is the broadest general-purpose standard, while flowcharts favor simplicity and EPC, IDEF0 and value stream maps each answer a narrower question very well.
Exam focus
Notations belong to BPM CBOK® knowledge area 2 and to the CBPP® 2026 blueprint sub-area Process Modeling Notations (2.2). Expect scenarios asking which notation fits a purpose or an audience, who uses UML activity diagrams, and how to serve frontline readers without losing rigor. The common trap is abandoning a rigorous standard for simplicity, or forcing everyone to learn all of it. Practise in the Process Modeling drill.
Practise this CBPP® blueprint area →FAQ
What is the most common process modeling notation?
BPMN is the most widely adopted standard for business process modeling. It is maintained by the Object Management Group and also published as an ISO standard. Simple flowcharts remain very common for procedures and training, because almost everyone can read them without preparation.
What is the difference between a flowchart and BPMN?
A flowchart uses a small set of generic symbols for steps and decisions. BPMN is a much richer standard: it distinguishes types of events, gateways and activities, shows collaboration between participants with pools and message flows, and can be precise enough for execution. A simple BPMN diagram looks much like a flowchart with lanes.
Who uses UML activity diagrams?
Mainly software and systems analysts. UML comes from software engineering, and its activity diagrams are used to describe behavior that a system must support, linking process steps to system design. Business process teams more often use BPMN, while Lean teams use value stream maps.
Can an organization use more than one notation?
Yes, and many do. A common pattern is one master notation for process flows, such as BPMN, plus specialized notations for specific questions: SIPOC for scoping, value stream maps for time and waste. What matters is that each notation has a clear use and that conventions are agreed.
Is IDEF0 still used?
Yes, mostly in systems engineering, defense and manufacturing contexts, where its strict structure of inputs, controls, outputs and mechanisms and its hierarchical decomposition are valued. In general business process work it has largely given way to BPMN and swimlane diagrams.
Sources
- Object Management Group (2013). Business Process Model and Notation (BPMN), Version 2.0.2; also ISO/IEC 19510:2013.
- National Institute of Standards and Technology (1993). Integration Definition for Function Modeling (IDEF0). FIPS Publication 183 (withdrawn 2008).
- Object Management Group (2017). Unified Modeling Language (UML), Version 2.5.1.
- Rother, M., & Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. Lean Enterprise Institute.
- ABPMP International (2019). BPM CBOK® Version 4.0, knowledge area 2: Process Modeling.
- Last reviewed
Related entries
In our other guides
- BPMN 2.0 Study Guide — BPMN 2.0 guide
- Process Modelling for Business Analysts — Business Analysis Guide