Event-Driven Process Chain (EPC)
An Event-driven Process Chain (EPC) is a process modeling notation in which events and functions alternate: each event describes a state that triggers a function, and each function produces a new event. Logical AND, OR and XOR connectors express splits and joins. EPC was developed in Germany in 1992 and is still used in enterprise-systems work.
Quick facts
- Type
- Process modeling notation
- Origin
- Keller, Nüttgens and Scheer, Institute for Information Systems, Saarland University, Germany (1992)
- Core elements
- Events (states), functions (activities), logical connectors (AND, OR, XOR), control flow
- Extended form
- eEPC adds organizational units, information objects and systems to functions
- Related concepts
- BPMN, process modeling notations, reference models, enterprise systems
- Reference
- BPM CBOK® v4, knowledge area 2 (Process Modeling)
- Exam relevance
- CBPP® 2026 blueprint 2.2 Process Modeling Notations
At a glance
- Event: shipment at the border — a state that triggers the chain
- Function: check customs papers — an activity that changes the state
- XOR connector — the function's result leads to exactly one of two events
- Event: papers complete — or, on the other branch, event: papers incomplete
- Function: release shipment — triggered by the event, producing a new one
- Event: shipment released — the end state of this chain
What is an Event-driven Process Chain?
An Event-driven Process Chain (EPC) describes a process as a chain of states and actions. It was introduced in 1992 by August-Wilhelm Scheer's research group at Saarland University, in work by Keller, Nüttgens and Scheer, as part of a method for modeling business processes and the information systems that support them.
The notation rests on one idea: a process is a sequence of events and functions that alternate.
- An event is a passive state, something that has happened or become true: "Order received", "Invoice approved".
- A function is an active step that does work and changes the state: "Check order", "Pay invoice".
- Logical connectors (AND, OR and XOR) split and join the flow.
- Control flow arrows connect the elements.
Events are usually drawn as hexagons and functions as rounded rectangles, although styles vary between tools and organizations. The extended EPC (eEPC) attaches further objects to functions: the organizational unit that performs it, the information it uses and the system that supports it.
An EPC is a notation in which every activity is framed by the states that trigger it and the states it produces.
What are the basic rules of an EPC?
EPC has a short set of syntax rules, as commonly taught, that keep models consistent:
- A chain starts and ends with events. The start event says what triggers the process; the end event says what state it leaves behind.
- Events and functions alternate. Two functions are not connected directly; an event between them states the result of the first and the trigger of the second.
- Connectors express logic. AND means all branches; XOR means exactly one; OR means one or more.
- Events do not decide. Because an event is passive, it is not followed directly by an XOR or OR split; the decision belongs to the preceding function, whose outcomes are shown as alternative events.
- Splits and joins match. A branch opened with one type of connector is normally closed with the same type.
These rules make EPC models verbose: even a simple process doubles its element count because every function needs events around it. The benefit is that the states of the process are always explicit, which helps when the model is used to configure systems or to check conditions.
The basic EPC rules force the modeler to state what is true before and after every step.
Where is EPC used today?
EPC spread through the 1990s and 2000s mainly with enterprise resource planning projects and the modeling method from which it came. Large reference models of standard business software were documented in EPC, and many organizations, notably in German-speaking countries, built extensive process libraries in it.
Today EPC is found in three situations:
- existing repositories, where organizations maintain large libraries of EPC models built over many years;
- enterprise-systems projects, where consultants and teams use EPC to align business processes with system configuration;
- teaching and research, where EPC is a classic example in business informatics and in the study of model correctness.
Since BPMN 2.0, many organizations have migrated to BPMN or model new processes in BPMN while keeping older EPC models. Conversion is possible but not mechanical, because the two notations express events, decisions and participants differently.
EPC remains relevant wherever large existing model libraries or enterprise-systems methods depend on it.
What does an EPC look like in practice?
Larchfield Logistics models customs clearance for imported shipments. In EPC form, the chain reads:
- Event: shipment arrived at the border.
- Function: check customs documents.
- XOR connector, followed by two alternative events: documents complete, or documents incomplete.
- On the incomplete branch, function: request missing documents from the shipper; event: documents received; then the flow joins the complete branch through an XOR join.
- Function: pay duties and release shipment.
- Event: shipment released for delivery.
In the extended form, the analyst attaches to "check customs documents" the customs team as the organizational unit, the commercial invoice and packing list as information objects, and the customs declaration system as supporting software.
Two things stand out when the team reviews the model. Every decision is visible as a pair of events, so the conditions for each branch are explicit. And the model is about twice as long as a BPMN version of the same flow, because every function has an event before and after it.
In practice, an EPC makes the states of a process explicit at the cost of a longer, more formal diagram.
What are the limitations of EPC?
EPC is simple to learn, makes states and conditions explicit and integrates well with organizational and data views in its extended form. Its limits explain why many organizations moved to BPMN:
- Verbosity. Alternating events and functions roughly doubles the number of elements, and trivial events ("Order checked") add clutter.
- Collaboration. EPC has no native concept equivalent to BPMN pools and message flows for interaction between independent organizations.
- Semantics of OR joins. The meaning of an OR join has been debated in the research literature, and some EPC models are ambiguous or contain errors that are hard to see.
- Limited standardization. EPC was never maintained by an international standards body in the way BPMN is, so symbols and extensions vary between tools.
- Execution. EPC models document processes and system configuration but are not usually executed directly by a process engine.
For teams that inherit EPC libraries, these limits argue for clear conventions, not necessarily for immediate migration.
EPC is a sound notation for documenting processes and their states, but it is weaker than BPMN for collaboration, standardization and execution.
EPC vs. BPMN: what is the difference?
| EPC | BPMN | |
|---|---|---|
| Origin | Saarland University research group (1992) | Business Process Management Initiative (2004), then the Object Management Group |
| Structure | Events and functions must alternate | Activities follow each other; events are used where they add meaning |
| Decisions | Logical connectors after a function (AND, OR, XOR) | Gateways of several types, including event-based |
| Collaboration | No native pools or message flow | Pools, lanes and message flow |
| Standardization and execution | No international standard; not usually executed | ISO/IEC 19510; executable at the executable level |
Both notations model control flow, but EPC makes every state explicit while BPMN adds a standardized language for collaboration and execution.
Exam focus
EPC belongs to BPM CBOK® knowledge area 2 and to the CBPP® 2026 blueprint sub-area Process Modeling Notations (2.2). Questions usually ask you to recognize a notation from its description: alternating events and functions joined by AND, OR and XOR connectors means EPC. The common trap is confusing it with IDEF0's inputs, controls, outputs and mechanisms, or with a value stream map's timeline. Practise in the Process Modeling drill.
Practise this CBPP® blueprint area →FAQ
What does EPC stand for in process modeling?
EPC stands for Event-driven Process Chain. It is a notation in which events, representing states, and functions, representing activities, alternate along the flow, with logical AND, OR and XOR connectors for splits and joins. It was developed at Saarland University in Germany in 1992.
What is the difference between an event and a function in an EPC?
An event is a passive state that has occurred, such as "Order received", and triggers the next step. A function is an active step that does work, such as "Check order", and produces a new state. In an EPC, events and functions alternate along the chain.
What is an extended EPC (eEPC)?
An extended EPC adds further objects to the functions of a basic EPC: the organizational unit responsible for the function, the information objects it reads or produces, and the application system that supports it. This links the process view to the organization and data views of a model.
Is EPC better than BPMN?
Neither is better in general. EPC makes the states of a process explicit and remains common in older enterprise-systems repositories. BPMN is an international standard, models collaboration between organizations more naturally and can be made executable. Most organizations now choose BPMN for new models.
Sources
- Keller, G., Nüttgens, M., & Scheer, A.-W. (1992). Semantische Prozeßmodellierung auf der Grundlage "Ereignisgesteuerter Prozeßketten (EPK)". Veröffentlichungen des Instituts für Wirtschaftsinformatik, Heft 89, Universität des Saarlandes.
- van der Aalst, W. M. P. (1999). Formalization and Verification of Event-driven Process Chains. Information and Software Technology, 41(10), 639–650.
- Kindler, E. (2006). On the semantics of EPCs: Resolving the vicious circle. Data & Knowledge Engineering, 56(1), 23–40.
- Mendling, J. (2008). Metrics for Process Models: Empirical Foundations of Verification, Error Prediction, and Guidelines for Correctness. Lecture Notes in Business Information Processing 6. Springer.
- ABPMP International (2019). BPM CBOK® Version 4.0, knowledge area 2: Process Modeling.
- Last reviewed
Related entries
In our other guides
- Process Modelling for Business Analysts — Business Analysis Guide