As-Is and To-Be Process Models (Current State and Future State)
As-is and to-be models are the two reference points of process change. The as-is model describes how a process works today, including workarounds, and gives a shared, factual baseline; the to-be model describes the intended future process that resolves known problems. Comparing the two shows what must change and how success will be judged.
Quick facts
- Type
- Modeling practice in improvement and redesign
- Origin
- "Is" and "should" process maps in Rummler and Brache (1990); current- and future-state maps in Lean practice
- Other names
- Current state and future state; "is" and "should" maps
- Key idea
- Model today only as far as needed to understand the problems; then design and test the future
- Related concepts
- Gap analysis, future-state design, process discovery, simulation, process analysis
- Reference
- BPM CBOK® v4, knowledge area 2 (Process Modeling)
- Exam relevance
- CBPP® 2026 blueprint 2.1 Process Modeling Standards; also 4.1 Process Design Principles
At a glance
- Agree scope and goals — which process, which problems, which measures
- Model the as-is, just enough — real practice, workarounds and main variants
- Analyze and measure — find causes of delay, error and cost
- Design the to-be — the intended process that resolves the problems
- Test with real cases — walk cases and exceptions with performers
- Plan the transition — the gaps between as-is and to-be become work
What are as-is and to-be process models?
An as-is model (also called a current-state model) describes how a process actually runs today: its steps, roles, handoffs, decisions, workarounds and main variants. A to-be model (future-state model) describes how the process is intended to run once identified problems have been addressed.
The pair has a long history. Rummler and Brache drew "is" and "should" process maps to move from today's cross-functional flow to an improved one, and Lean practice draws current-state and future-state value stream maps for the same purpose.
The two models play different roles:
- the as-is model creates shared understanding and a baseline against which analysis is done and the effect of change is judged;
- the to-be model communicates the intended design to the people who will implement and work in it;
- the difference between them defines the change: new or removed steps, new roles, rules and systems, and new measures.
Neither model is an end in itself. The as-is model exists to understand the problems; the to-be model exists to guide change.
As-is and to-be models are the before-and-after pictures that make process change explicit and measurable.
Why model the as-is process at all?
Teams under time pressure sometimes want to skip straight to the future. There are good reasons not to:
- Shared facts. People in different departments hold different, partial pictures of the process. An as-is model puts them on one page, often for the first time.
- Root causes. Problems cannot be fixed reliably without understanding where they arise: in a handoff, a missing rule, a rework loop.
- Baseline. Without a documented starting point and baseline measures, nobody can show later whether the change improved anything.
- Hidden requirements. Workarounds often exist for good reasons, such as an exception the documented procedure ignores. A future design that drops them can fail on day one.
- Change readiness. People accept a redesign more readily when they recognize their current work in the starting model.
An as-is model is not a test of whether staff follow procedures, and it does not replace measurement. It complements data by showing where to measure and how to interpret results.
There are exceptions. A truly new process, or a deliberate clean-sheet redesign, may need only a light as-is view to capture constraints and lessons.
Modeling the as-is process gives a change its factual baseline and protects it from redesigning a process nobody really understood.
How much detail does an as-is model need?
Enough to understand the main problems and support the analysis, and no more. This is one of the most common judgment calls in process work, and one of the most common failures.
Teams fall into analysis paralysis when they try to document every variant and every exception of the current process before moving on. Weeks pass, sponsors lose patience, and the detail adds little: much of it describes behavior that the redesign will remove anyway. Some practitioners call this the as-is trap.
Practical guidelines:
- Fix the purpose first. Which problems and measures matter? Model the parts of the process where they arise in more detail, and the rest at a high level.
- Timebox the as-is work, for example to a few weeks for a typical end-to-end process.
- Capture main variants, not every one; note rare exceptions as a list rather than modeling them.
- Stop when new detail stops changing conclusions about causes and priorities.
When as-is work has already run too long, the right move is to limit further detail to what is needed to understand the main problems and then move on. Discarding the as-is work altogether wastes the understanding already gained.
The right level of as-is detail is set by the problems being solved, not by the wish for a complete record.
How do you check that a to-be model will work?
A to-be model can look convincing on paper and still fail in operation. Before implementation, practitioners test it in several ways:
- Case walkthroughs. Take a set of realistic recent cases, including awkward exceptions, and walk each one through the new design with the people who will do the work. Gaps, missing decisions and impossible handoffs appear quickly.
- Measures. Check that the design includes how its performance will be measured, and estimate expected results against the as-is baseline.
- Simulation. Where queues, staffing or peak loads matter, simulate the to-be model with realistic volumes.
- Pilots. Run the design in one site, team or product line before full rollout.
At Harbourside Council, a redesigned housing-repair process removes a supervisor's approval for routine repairs. Walking twenty recent requests through the new model with repair coordinators shows that out-of-hours emergency repairs, which arrive by phone to a contractor, have no path in the design. The to-be model is corrected before go-live.
Some checks prove little. A lower step count does not show that a design is better: fewer steps can hide rework, risk or longer waits. Layout and color reviews improve readability, not feasibility.
A to-be model is ready when realistic cases, including exceptions, have been walked through it successfully by the people who will run it.
What are the limitations of as-is and to-be modeling?
The as-is and to-be pair gives process change a clear baseline, a shared target and an explicit list of differences to implement and measure. Its limits are worth managing:
- As-is paralysis. Excessive current-state detail delays change and costs goodwill.
- Anchoring. Detailed as-is models can trap designers in today's structure, producing small adjustments where a radical redesign was needed.
- Idealized to-be models. Future-state models drawn without performers tend to omit exceptions and real constraints.
- Static pictures. Neither model shows how long work waits or how the process behaves under peak load, unless data, value stream maps or simulation are added.
- Transition gaps. The path between the two states, with interim steps, training and system changes, often matters as much as the end state and is easily underplanned.
Timeboxing, involving performers in both models and planning transition states address most of these limits.
As-is and to-be models are most useful as working tools for change, sized to the problem and tested against real cases.
As-is model vs. to-be model: what is the difference?
| As-is model | To-be model | |
|---|---|---|
| Describes | How the process actually runs today | How the process is intended to run after the change |
| Includes | Real practice, workarounds, main variants, known problems | Resolved problems, new rules, roles, systems and measures |
| Main purpose | Shared understanding, analysis and a baseline | Communicating and implementing the design |
| Built from | Discovery: observation, interviews, documents, data | Analysis findings, design principles, stakeholder input |
| Typical risk | Too much detail, too slowly | Too idealized, missing exceptions |
The as-is model shows where a process starts from and why it falls short; the to-be model shows where it should go. Gap analysis between them turns the difference into a plan.
Exam focus
As-is and to-be models belong to BPM CBOK® knowledge area 2 and to the CBPP® 2026 blueprint sub-area Process Modeling Standards (2.1), with links to Process Design Principles (4.1). Expect scenarios about the purpose of each model, an as-is phase that has run too long, and checks before implementing a future state. The common traps are documenting every variant, judging a design by its step count, and skipping walkthroughs with performers. Practise in the Process Modeling drill.
Practise this CBPP® blueprint area →FAQ
What is the difference between an as-is and a to-be process?
The as-is process is how work is done today, including workarounds and problems. The to-be process is the intended future process, designed to resolve those problems. The as-is model gives a baseline for analysis and measurement; the to-be model guides implementation.
What is the main purpose of an as-is model?
To give everyone involved a shared, factual baseline of how the process works today. It supports analysis of problems and their causes and provides the starting point against which the effect of changes can be judged. It complements measurement rather than replacing it.
How long should as-is modeling take?
There is no fixed rule, but it should be timeboxed and stop once further detail no longer changes conclusions about the main problems. Documenting every variant of a process that will be redesigned delays change and adds little value.
Can you skip the as-is model and go straight to the to-be?
Sometimes, for a genuinely new process or a deliberate clean-sheet redesign. Even then, a light as-is view helps capture constraints, hidden requirements and baseline measures. Skipping it entirely risks a design that ignores why the current workarounds exist.
How do you validate a to-be process model?
Walk realistic cases, including exceptions, through the new design with the people who will do the work, and check the planned measures. Where capacity matters, simulate it; where risk is high, run a pilot. A lower number of steps alone does not prove a better design.
Sources
- Rummler, G. A., & Brache, A. P. (1990; 2nd ed. 1995; 3rd ed. 2013). Improving Performance: How to Manage the White Space on the Organization Chart. Jossey-Bass/Wiley.
- Sharp, A., & McDermott, P. (2009). Workflow Modeling: Tools for Process Improvement and Application Development (2nd ed.). Artech House.
- Rother, M., & Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda. Lean Enterprise Institute.
- ABPMP International (2019). BPM CBOK® Version 4.0, knowledge area 2: Process Modeling.
- Last reviewed
Related entries
In our other guides
- Future State Definition and Gap Analysis — Business Analysis Guide