Requirements Analysis & Design

Acceptance and Evaluation Criteria (incl. Given/When/Then)

Acceptance criteria are the conditions a requirement, story or solution must meet before stakeholders accept it as complete. Evaluation criteria are the measures used to compare or rank options against each other. Both are agreed in advance and stated as observable results, so that acceptance and choice rest on evidence rather than opinion.

Quick facts

Type
Requirements and evaluation technique
Origin
Acceptance testing in engineering contracts; Given/When/Then from behavior-driven development, D. North and C. Matts (mid-2000s)
Used when
A requirement, story or solution must be accepted, or options must be compared
Variants
Given/When/Then scenarios, rule checklists, measurable thresholds, weighted scoring
Related techniques
User stories, non-functional requirements, vendor assessment, decision analysis
Reference
BABOK® Guide v3, §10.1 (Acceptance and Evaluation Criteria)
Exam relevance
Not named in the ECBA™ blueprint; relevant to CCBA®/CBAP® (Requirements Analysis and Design Definition, Solution Evaluation)
Acceptance and Evaluation Criteria (incl. Given/When/Then)Start from the need or story: what outcome must be achieved, and for whom. Ask for examples: typical cases, edge cases and failures. Write observable conditions: Given/When/Then or a short rule list. Make every target measurable: numbers, limits and named standards. Agree them before the work: with the stakeholders who will accept it. Use them to accept or compare: pass/fail for acceptance, scores for choice1Start from the need orstory2Ask for examples3Write observableconditions4Make every targetmeasurable5Agree them before the work6Use them to accept orcompare

At a glance

  1. Start from the need or story — what outcome must be achieved, and for whom
  2. Ask for examples — typical cases, edge cases and failures
  3. Write observable conditions — Given/When/Then or a short rule list
  4. Make every target measurable — numbers, limits and named standards
  5. Agree them before the work — with the stakeholders who will accept it
  6. Use them to accept or compare — pass/fail for acceptance, scores for choice

What is the difference between acceptance criteria and evaluation criteria?

The two kinds of criteria answer different questions:

Acceptance criteriaEvaluation criteria
QuestionIs this good enough to accept?Which option is better, and by how much?
ResultPass or fail against a thresholdA score or ranking across options
Typical useAccepting a user story, a release or a delivered solutionComparing design options, vendor proposals or alternatives
Example"A refund is issued within two minutes of approval""Ease of integration, weighted 20%, scored 1 to 5"

The same quality can appear in both. At Harbourside Council, "supports the council's two official languages" is an acceptance criterion for the chosen permit system and also a must-have filter when comparing suppliers; "speed of processing" is scored as an evaluation criterion to rank the suppliers that pass the filter.

Keeping the two apart avoids a common mix-up: treating a scored preference as if it were a hard condition, or the other way round. Acceptance criteria and evaluation criteria are therefore complementary tools, one for accepting and one for choosing.

Why do acceptance criteria matter when validating a solution?

Acceptance criteria give validation an agreed yardstick. When they are written before the work starts, everyone knows what "done" means: the stakeholders who will accept the result, the people building it and the people testing it.

Without them, acceptance turns into a debate. A stakeholder at Brightwater Health who expected appointment reminders to go out in the patient's preferred language may reject a release that the delivery team considers finished. With a criterion such as "the reminder is sent in the language recorded on the patient's file", the question becomes a simple check.

Acceptance criteria describe the result expected, not how to achieve it. "The search shows matching claims within two seconds" is a criterion; "add an index to the claims table" is a design instruction that belongs to the delivery team. Criteria are also not effort estimates or attendee lists for demonstrations; those are planning concerns.

Standards and regulations enter the same way. When an organization commits to an accessibility or data protection standard, its relevant clauses become requirements and acceptance criteria that the solution can be built and checked against.

Acceptance criteria are what turn validation from opinion into evidence.

How do you write acceptance criteria with Given/When/Then?

Behavior-driven development, introduced by Dan North with Chris Matts in the mid-2000s, popularized a three-part format for scenarios:

  • Given a starting context;
  • When an event or action happens;
  • Then an observable outcome follows.

At Northgate Insurance, a story lets policyholders report a car accident online. Two of its criteria read:

  1. Given a policyholder with an active motor policy, when they submit an accident report with all mandatory fields, then a claim reference is shown and sent by email.
  2. Given a policy that lapsed before the accident date, when the policyholder submits a report, then the report is accepted but flagged for a handler to review cover.

Each scenario describes one behavior, uses the business's own words and can be checked by anyone. Many teams write them together in a short session with a business representative, a developer and a tester, using concrete examples to find gaps before any work begins.

Given/When/Then is not the only format. A short checklist of rules ("a reference is issued for every submitted report") works well for simple conditions.

Given/When/Then is most useful when behavior depends on context, because it forces the team to name the context explicitly.

What makes acceptance criteria good?

Good acceptance criteria share a few qualities:

  • Testable and observable. Anyone can check them, and they produce a clear yes or no.
  • Measurable where quality matters. "Fast" and "user-friendly" become numbers, limits or named standards, such as a response time or a success rate in a usability test.
  • About outcomes, not implementation. They state what the user or business sees, leaving design choices open.
  • Agreed in advance with the stakeholders who will accept the result, not written after the work to match what was built.
  • Sized to the item. A user story usually needs between one and a handful of criteria; a long list often signals a story that should be split.
  • Traced to their source. A criterion that enforces a regulation or policy records where it comes from.

Criteria that apply to everything, such as accessibility or security rules, are often kept once at team level instead of being repeated on every story; in scrum this is part of the definition of done.

Acceptance criteria that meet these qualities let a team finish work once, instead of reworking it after a late disagreement.

What are the limitations of acceptance criteria?

Acceptance criteria are simple, cheap to write and widely understood. They make expectations explicit and give testing and validation a shared reference. Their limits are mostly about scope and judgment:

  • They test what was foreseen. Criteria cover the cases people thought of; exploratory testing and real use still find the rest.
  • Passing is not the same as delivering value. A solution can meet every criterion and still not solve the business problem if the criteria were wrong. Validating the requirements themselves comes first.
  • Over-specification. Criteria that describe screens and fields in detail drift into design and remove the team's room to find a better answer.
  • Weighting is subjective. Evaluation criteria need agreed weights; a small change in weights can reverse a ranking, so sensitivity should be checked.
  • Hard-to-measure qualities. Some needs, such as trust or ease of learning, only become measurable with effort, for example through usability testing.

Acceptance and evaluation criteria are most reliable when they are traced to validated needs and reviewed with the stakeholders who will use them.

Acceptance criteria vs. definition of done: what is the difference?

Acceptance criteriaDefinition of done
ScopeOne story, requirement or solutionEvery item the team delivers
ContentBehavior and results specific to that itemShared quality standards, such as reviewed, tested, documented
Who agrees itStakeholders or product owner with the teamThe team, within organizational standards
ChangesWith each itemRarely; it evolves as the team matures
Question answeredDoes this item do what was asked?Is this item finished to our usual standard?

Acceptance criteria say what a specific item must do; the definition of done says what every item must satisfy. An item is complete only when it meets both.

Exam focus

Acceptance and Evaluation Criteria (BABOK® Guide §10.1) is not one of the 20 techniques named in the ECBA™ blueprint, but it underpins Solution domain questions on validation (statement 6.1) and Need questions on testable requirements. Expect questions on the purpose of acceptance criteria and on turning a vague need or a standard into checkable conditions. A common trap picks an option that describes design, estimation or sign-off logistics instead. Practise in the Solution domain drill.

Practise this ECBA™ domain →

FAQ

What are acceptance criteria in business analysis?

Acceptance criteria are the conditions that a requirement, user story or solution must meet before the stakeholders accept it as complete. They are agreed in advance, describe observable results rather than design, and give testing and validation a shared reference for deciding whether the work is done.

What is the Given/When/Then format?

Given/When/Then is a way of writing acceptance criteria as scenarios: Given a starting context, When an event happens, Then an observable outcome follows. It comes from behavior-driven development and helps business people, developers and testers agree on concrete examples before work starts.

Who writes acceptance criteria?

The business analyst or product owner usually drafts them, but they should be agreed with the stakeholders who will accept the result and reviewed with the people who build and test it. Writing them together, around concrete examples, tends to surface gaps and misunderstandings early.

What are evaluation criteria used for?

Evaluation criteria are measures used to compare options, such as design alternatives or supplier proposals. Each criterion is usually weighted by importance, and each option is scored against it. Mandatory conditions are often applied first as pass or fail filters, before the remaining options are scored.

How many acceptance criteria should a user story have?

There is no fixed number. Most stories need one to a handful of criteria that cover the main behavior and important exceptions. A long list is often a sign that the story is too big and should be split into smaller stories that can each be accepted on their own.

Sources

Last reviewed

IIBA®, BABOK®, A Guide to the Business Analysis Body of Knowledge®, CBAP® and CCBA® are registered trademarks of International Institute of Business Analysis. ECBA™ and BACCM™ are trademarks of International Institute of Business Analysis. Other names may be trademarks of their respective owners. This guide is independent and is not affiliated with, endorsed by or sponsored by IIBA®. Its practice questions are original and are not taken from any IIBA® exam.