Business Process Transformation

Six Sigma and DMAIC (Define, Measure, Analyze, Improve, Control)

Six Sigma is a data-driven improvement approach that reduces variation and defects in a process, using statistical analysis and a structured project method. Six Sigma projects on existing processes usually follow DMAIC: Define the problem, Measure current performance, Analyze root causes, Improve the process, and Control it so the gains last.

Quick facts

Type
Improvement methodology (data-driven, project-based)
Origin
Motorola in the mid-1980s; spread widely by General Electric from the mid-1990s
Key idea
Reduce variation so that the process delivers what customers need, consistently
Project cycle
DMAIC for existing processes; DMADV (Design for Six Sigma) for new ones
Typical metrics
Defects per million opportunities, sigma level, first-pass yield, rolled throughput yield
Reference
BPM CBOK® v4, knowledge area 6 (Business Process Transformation)
Exam relevance
CBPP® 2026 blueprint 6.2 Process Design Methodologies; also 5.2 Process Metrics
Six Sigma and DMAIC (Define, Measure, Analyze, Improve, Control)Define: problem, scope, customer requirements, goal. Measure: check the data is reliable; set the baseline. Analyze: find and verify root causes with data. Improve: design, pilot and confirm solutions. Control: control plan, monitoring, handover to the owner1Define2Measure3Analyze4Improve5Control

At a glance

  1. Define — problem, scope, customer requirements, goal
  2. Measure — check the data is reliable; set the baseline
  3. Analyze — find and verify root causes with data
  4. Improve — design, pilot and confirm solutions
  5. Control — control plan, monitoring, handover to the owner

What is Six Sigma?

Six Sigma treats poor process performance as a problem of variation. A process that delivers in two days on average but sometimes in ten frustrates customers more than its average suggests. Six Sigma asks what drives that variation and removes the causes, using data rather than opinion.

The approach was developed at Motorola in the mid-1980s and adopted on a large scale by General Electric from 1995. The name comes from statistics: a process running at "six sigma" quality produces about 3.4 defects per million opportunities, under the convention that the process mean may shift by 1.5 standard deviations over time.

Six Sigma programs typically share:

  • a focus on critical-to-quality requirements defined from the customer's point of view;
  • projects with a business case, a sponsor (often called a Champion) and trained leaders (Black Belts and Green Belts);
  • a structured project cycle: DMAIC for improving an existing process, and DMADV or Design for Six Sigma for designing a new one.

Six Sigma is therefore a disciplined way to reduce variation and defects, organized as data-driven projects with clear roles.

What are the DMAIC phases?

PhaseKey questionTypical toolsOutput
DefineWhat is the problem, for whom, and what is in scope?Project charter, SIPOC, voice of the customerAgreed problem, goal and scope
MeasureHow does the process perform today, and can we trust the data?Data collection plan, measurement system analysis, baseline chartsReliable baseline
AnalyzeWhat really causes the problem?Pareto, cause-and-effect diagram, hypothesis tests, regressionVerified root causes
ImproveWhich changes remove the causes?Solution selection, pilots, mistake-proofingTested solution
ControlHow do we keep the gains?Control plan, control charts, standard workSustained performance, owner handover

Two details are often missed. In Measure, the team checks that the measurement system itself is reliable before quantifying the baseline; a baseline built on inconsistent data misleads every later phase. Many organizations also hold a review at the end of each phase, a "tollgate", before moving on.

DMAIC turns Six Sigma into a repeatable project sequence, in which each phase produces evidence that the next one depends on.

Why does the Analyze phase matter so much?

The most common DMAIC failure is to jump from a measured problem straight to a solution that someone believed in from the first meeting. The project then measures, buys or builds, and finds that the problem remains.

The Analyze phase exists to prevent this. The team lists possible causes, often with a cause-and-effect diagram, and then tests them against data: does the defect rate actually differ between shifts, suppliers, case types or locations? Only causes that the data supports go forward to Improve.

At Larchfield Logistics, a team studying late delivery notes suspects that the handheld scanners are too slow. Analysis of timestamps shows instead that most late notes come from one depot where notes are printed in a single batch at the end of each shift. A new scanner fleet would have cost money and changed nothing.

Skipping Analyze also weakens the business case. Without verified causes, nobody can explain why the chosen solution should work, and the result cannot be attributed to the change.

The Analyze phase is what makes Six Sigma evidence-based: solutions address causes that the data has confirmed, not causes that seemed plausible.

How does the Control phase sustain the gains?

Many improvement projects deliver good results that fade within months of the team disbanding. People slip back to old habits, new staff are trained the old way and nobody notices the measure drifting. Control is the phase that prevents this.

A typical Control phase includes:

  • a control plan naming the key measures, how often they are checked, the limits that trigger action and who reacts;
  • standard work and updated procedures, so that the new way is the documented way;
  • monitoring, often with control charts that separate normal variation from a real change;
  • mistake-proofing, where possible, so that errors are prevented rather than caught;
  • a formal handover to the process owner, who keeps the measures in regular performance reviews.

A procedure published on the intranet is not enough on its own. Without an owner who watches the measure and acts on drift, performance tends to return to its old level.

The Control phase is where Six Sigma hands the improvement back to process management, and it decides whether the gains last.

Which Six Sigma metrics should process professionals know?

A few Six Sigma metrics appear across process measurement:

  • Defects per million opportunities (DPMO): defects divided by the total number of opportunities for a defect, scaled to one million. It allows comparison between processes of different complexity.
  • Sigma level: a translation of DPMO onto the sigma scale; higher is better.
  • First-pass yield: the share of units that pass a step right the first time, without rework.
  • Rolled throughput yield (RTY): the probability that a unit passes every step right the first time. It is the product of the first-pass yields of the steps.

Rolled throughput yield is a useful reminder of how errors compound. At Northgate Insurance, a policy passes four steps with first-pass yields of 98%, 95%, 90% and 97%. RTY is 0.98 × 0.95 × 0.90 × 0.97, or about 81%: almost one policy in five needs rework somewhere, although no single step looks poor. RTY is always lower than the weakest step's yield.

These Six Sigma metrics express quality from the end-to-end point of view, which makes them a natural fit for process performance management.

What are the limitations of Six Sigma?

Six Sigma is strong where problems are complex and data is available: it replaces opinion with evidence, it verifies causes before spending money, and its Control phase builds sustainability into the method. Its limits are:

  • Overhead. Formal projects, statistical analysis and tollgates are heavy for simple problems that a short PDCA cycle or a Kaizen event would fix.
  • Data dependence. Where data is scarce or unreliable, much of the effort goes into measurement before any improvement.
  • Narrow focus on variation. Six Sigma can reduce defects in a process that is slow because of waiting; Lean is often the better first lens for lead time.
  • Incremental scope. DMAIC improves an existing design; it does not tell you when the design should be replaced.
  • Program bureaucracy. Counting certified belts or projects can replace attention to business results.

Combining Six Sigma with Lean, and placing projects under process owners and governance, addresses several of these limits.

Six Sigma is most valuable for problems of variation and defects that matter enough to justify a data-driven project.

Six Sigma vs. Total Quality Management: what is the difference?

Six SigmaTotal Quality Management
NatureProject-based improvement methodologyOrganization-wide management philosophy
StructureDMAIC projects with a business case and trained leadersPrinciples and practices applied by everyone, every day
GoalMeasurable reduction of variation and defectsCustomer-focused quality built into all processes
MeasurementExplicit financial and statistical targets per projectBroad quality and customer measures
EraFrom the mid-1980sFrom the 1950s to the 1990s, roots in Deming and Juran

TQM sets the quality philosophy for the whole organization; Six Sigma provides a structured, data-driven project method that delivers measurable results within it. Many of Six Sigma's tools come from the quality movement that shaped TQM.

Exam focus

Six Sigma and DMAIC belong to BPM CBOK® knowledge area 6 and to the CBPP® 2026 blueprint sub-area Process Design Methodologies (6.2), with links to Process Metrics (5.2). Questions ask which phase sets the baseline, what a team skipped when it jumped to a solution, why gains fade after a project, and how to compute rolled throughput yield. The common trap is treating a documented procedure as Control. Practise in the Process Improvement drill.

Practise this CBPP® blueprint area →

FAQ

What does DMAIC stand for?

DMAIC stands for Define, Measure, Analyze, Improve and Control. It is the five-phase project cycle Six Sigma uses to improve an existing process: define the problem and scope, measure current performance reliably, analyze and verify root causes, improve the process by addressing them, and control it so the gains last.

What does 3.4 defects per million mean in Six Sigma?

It is the defect rate associated with six sigma quality: about 3.4 defects per million opportunities. The figure assumes the process mean can drift by 1.5 standard deviations over time. In practice, few business processes reach that level; the sigma scale is mainly used to compare processes and track progress.

How do you calculate rolled throughput yield?

Multiply the first-pass yields of all the steps. For three steps with yields of 95%, 90% and 85%, rolled throughput yield is 0.95 × 0.90 × 0.85, or about 73%. It is the probability that a unit passes every step right the first time, and it is always lower than the weakest step's yield.

What is the difference between DMAIC and DMADV?

DMAIC improves an existing process whose performance falls short. DMADV, used in Design for Six Sigma, designs a new process or product: Define, Measure customer needs, Analyze design options, Design, and Verify. Teams choose DMADV when the current process cannot be improved enough or does not exist.

Who is responsible for sustaining a Six Sigma improvement?

The process owner. The project team designs the controls, such as the control plan, standard work and monitoring, and hands them over at the end of the Control phase. After that, the process owner keeps the key measures in regular reviews and acts when performance drifts.

Sources

Last reviewed

CBPP®, CBPA®, CBPL® and BPM CBOK® are registered marks of the Association of Business Process Management Professionals International (ABPMP). Other names may be trademarks of their respective owners. This guide is independent and is not affiliated with, endorsed by or sponsored by ABPMP International or any of its chapters and affiliates, including ABPMP Brasil and France Processus. Its practice questions are original and are not taken from any ABPMP exam.