Six Sigma and DMAIC (Define, Measure, Analyze, Improve, Control)
Six Sigma is a data-driven improvement approach that reduces variation and defects in a process, using statistical analysis and a structured project method. Six Sigma projects on existing processes usually follow DMAIC: Define the problem, Measure current performance, Analyze root causes, Improve the process, and Control it so the gains last.
Quick facts
- Type
- Improvement methodology (data-driven, project-based)
- Origin
- Motorola in the mid-1980s; spread widely by General Electric from the mid-1990s
- Key idea
- Reduce variation so that the process delivers what customers need, consistently
- Project cycle
- DMAIC for existing processes; DMADV (Design for Six Sigma) for new ones
- Typical metrics
- Defects per million opportunities, sigma level, first-pass yield, rolled throughput yield
- Reference
- BPM CBOK® v4, knowledge area 6 (Business Process Transformation)
- Exam relevance
- CBPP® 2026 blueprint 6.2 Process Design Methodologies; also 5.2 Process Metrics
At a glance
- Define — problem, scope, customer requirements, goal
- Measure — check the data is reliable; set the baseline
- Analyze — find and verify root causes with data
- Improve — design, pilot and confirm solutions
- Control — control plan, monitoring, handover to the owner
What is Six Sigma?
Six Sigma treats poor process performance as a problem of variation. A process that delivers in two days on average but sometimes in ten frustrates customers more than its average suggests. Six Sigma asks what drives that variation and removes the causes, using data rather than opinion.
The approach was developed at Motorola in the mid-1980s and adopted on a large scale by General Electric from 1995. The name comes from statistics: a process running at "six sigma" quality produces about 3.4 defects per million opportunities, under the convention that the process mean may shift by 1.5 standard deviations over time.
Six Sigma programs typically share:
- a focus on critical-to-quality requirements defined from the customer's point of view;
- projects with a business case, a sponsor (often called a Champion) and trained leaders (Black Belts and Green Belts);
- a structured project cycle: DMAIC for improving an existing process, and DMADV or Design for Six Sigma for designing a new one.
Six Sigma is therefore a disciplined way to reduce variation and defects, organized as data-driven projects with clear roles.
What are the DMAIC phases?
| Phase | Key question | Typical tools | Output |
|---|---|---|---|
| Define | What is the problem, for whom, and what is in scope? | Project charter, SIPOC, voice of the customer | Agreed problem, goal and scope |
| Measure | How does the process perform today, and can we trust the data? | Data collection plan, measurement system analysis, baseline charts | Reliable baseline |
| Analyze | What really causes the problem? | Pareto, cause-and-effect diagram, hypothesis tests, regression | Verified root causes |
| Improve | Which changes remove the causes? | Solution selection, pilots, mistake-proofing | Tested solution |
| Control | How do we keep the gains? | Control plan, control charts, standard work | Sustained performance, owner handover |
Two details are often missed. In Measure, the team checks that the measurement system itself is reliable before quantifying the baseline; a baseline built on inconsistent data misleads every later phase. Many organizations also hold a review at the end of each phase, a "tollgate", before moving on.
DMAIC turns Six Sigma into a repeatable project sequence, in which each phase produces evidence that the next one depends on.
Why does the Analyze phase matter so much?
The most common DMAIC failure is to jump from a measured problem straight to a solution that someone believed in from the first meeting. The project then measures, buys or builds, and finds that the problem remains.
The Analyze phase exists to prevent this. The team lists possible causes, often with a cause-and-effect diagram, and then tests them against data: does the defect rate actually differ between shifts, suppliers, case types or locations? Only causes that the data supports go forward to Improve.
At Larchfield Logistics, a team studying late delivery notes suspects that the handheld scanners are too slow. Analysis of timestamps shows instead that most late notes come from one depot where notes are printed in a single batch at the end of each shift. A new scanner fleet would have cost money and changed nothing.
Skipping Analyze also weakens the business case. Without verified causes, nobody can explain why the chosen solution should work, and the result cannot be attributed to the change.
The Analyze phase is what makes Six Sigma evidence-based: solutions address causes that the data has confirmed, not causes that seemed plausible.
How does the Control phase sustain the gains?
Many improvement projects deliver good results that fade within months of the team disbanding. People slip back to old habits, new staff are trained the old way and nobody notices the measure drifting. Control is the phase that prevents this.
A typical Control phase includes:
- a control plan naming the key measures, how often they are checked, the limits that trigger action and who reacts;
- standard work and updated procedures, so that the new way is the documented way;
- monitoring, often with control charts that separate normal variation from a real change;
- mistake-proofing, where possible, so that errors are prevented rather than caught;
- a formal handover to the process owner, who keeps the measures in regular performance reviews.
A procedure published on the intranet is not enough on its own. Without an owner who watches the measure and acts on drift, performance tends to return to its old level.
The Control phase is where Six Sigma hands the improvement back to process management, and it decides whether the gains last.
Which Six Sigma metrics should process professionals know?
A few Six Sigma metrics appear across process measurement:
- Defects per million opportunities (DPMO): defects divided by the total number of opportunities for a defect, scaled to one million. It allows comparison between processes of different complexity.
- Sigma level: a translation of DPMO onto the sigma scale; higher is better.
- First-pass yield: the share of units that pass a step right the first time, without rework.
- Rolled throughput yield (RTY): the probability that a unit passes every step right the first time. It is the product of the first-pass yields of the steps.
Rolled throughput yield is a useful reminder of how errors compound. At Northgate Insurance, a policy passes four steps with first-pass yields of 98%, 95%, 90% and 97%. RTY is 0.98 × 0.95 × 0.90 × 0.97, or about 81%: almost one policy in five needs rework somewhere, although no single step looks poor. RTY is always lower than the weakest step's yield.
These Six Sigma metrics express quality from the end-to-end point of view, which makes them a natural fit for process performance management.
What are the limitations of Six Sigma?
Six Sigma is strong where problems are complex and data is available: it replaces opinion with evidence, it verifies causes before spending money, and its Control phase builds sustainability into the method. Its limits are:
- Overhead. Formal projects, statistical analysis and tollgates are heavy for simple problems that a short PDCA cycle or a Kaizen event would fix.
- Data dependence. Where data is scarce or unreliable, much of the effort goes into measurement before any improvement.
- Narrow focus on variation. Six Sigma can reduce defects in a process that is slow because of waiting; Lean is often the better first lens for lead time.
- Incremental scope. DMAIC improves an existing design; it does not tell you when the design should be replaced.
- Program bureaucracy. Counting certified belts or projects can replace attention to business results.
Combining Six Sigma with Lean, and placing projects under process owners and governance, addresses several of these limits.
Six Sigma is most valuable for problems of variation and defects that matter enough to justify a data-driven project.
Six Sigma vs. Total Quality Management: what is the difference?
| Six Sigma | Total Quality Management | |
|---|---|---|
| Nature | Project-based improvement methodology | Organization-wide management philosophy |
| Structure | DMAIC projects with a business case and trained leaders | Principles and practices applied by everyone, every day |
| Goal | Measurable reduction of variation and defects | Customer-focused quality built into all processes |
| Measurement | Explicit financial and statistical targets per project | Broad quality and customer measures |
| Era | From the mid-1980s | From the 1950s to the 1990s, roots in Deming and Juran |
TQM sets the quality philosophy for the whole organization; Six Sigma provides a structured, data-driven project method that delivers measurable results within it. Many of Six Sigma's tools come from the quality movement that shaped TQM.
Exam focus
Six Sigma and DMAIC belong to BPM CBOK® knowledge area 6 and to the CBPP® 2026 blueprint sub-area Process Design Methodologies (6.2), with links to Process Metrics (5.2). Questions ask which phase sets the baseline, what a team skipped when it jumped to a solution, why gains fade after a project, and how to compute rolled throughput yield. The common trap is treating a documented procedure as Control. Practise in the Process Improvement drill.
Practise this CBPP® blueprint area →FAQ
What does DMAIC stand for?
DMAIC stands for Define, Measure, Analyze, Improve and Control. It is the five-phase project cycle Six Sigma uses to improve an existing process: define the problem and scope, measure current performance reliably, analyze and verify root causes, improve the process by addressing them, and control it so the gains last.
What does 3.4 defects per million mean in Six Sigma?
It is the defect rate associated with six sigma quality: about 3.4 defects per million opportunities. The figure assumes the process mean can drift by 1.5 standard deviations over time. In practice, few business processes reach that level; the sigma scale is mainly used to compare processes and track progress.
How do you calculate rolled throughput yield?
Multiply the first-pass yields of all the steps. For three steps with yields of 95%, 90% and 85%, rolled throughput yield is 0.95 × 0.90 × 0.85, or about 73%. It is the probability that a unit passes every step right the first time, and it is always lower than the weakest step's yield.
What is the difference between DMAIC and DMADV?
DMAIC improves an existing process whose performance falls short. DMADV, used in Design for Six Sigma, designs a new process or product: Define, Measure customer needs, Analyze design options, Design, and Verify. Teams choose DMADV when the current process cannot be improved enough or does not exist.
Who is responsible for sustaining a Six Sigma improvement?
The process owner. The project team designs the controls, such as the control plan, standard work and monitoring, and hands them over at the end of the Control phase. After that, the process owner keeps the key measures in regular reviews and acts when performance drifts.
Sources
- Harry, M., & Schroeder, R. (2000). Six Sigma: The Breakthrough Management Strategy Revolutionizing the World's Top Corporations. Currency/Doubleday.
- Pande, P. S., Neuman, R. P., & Cavanagh, R. R. (2000). The Six Sigma Way: How GE, Motorola, and Other Top Companies Are Honing Their Performance. McGraw-Hill.
- Schroeder, R. G., Linderman, K., Liedtke, C., & Choo, A. S. (2008). Six Sigma: Definition and underlying theory. Journal of Operations Management, 26(4), 536–554.
- ABPMP International (2019). BPM CBOK® Version 4.0, knowledge area 6: Business Process Transformation.
- Last reviewed