Process Design

Defining KPIs During Process Design

Defining KPIs during process design means setting the performance indicators, targets and data sources of a future process before it is approved and built. KPIs defined during process design link the process to its goals, make the design testable in a pilot and let the process owner manage performance from the first day of operation.

Quick facts

Type
Design practice (performance measures built into the design)
Origin
Process-level measurement (Rummler and Brache, 1990), the Balanced Scorecard (Kaplan and Norton, 1992) and later process-performance literature
Key idea
Measures and targets are part of the design, not an afterthought of go-live
Typical dimensions
Time, cost, quality and flexibility, measured end to end
Related concepts
KPI vs. metric vs. measure, process performance management, baseline, benefits realization
Reference
BPM CBOK® v4, knowledge area 4 (Process Design)
Exam relevance
CBPP® 2026 blueprint 4.1 Process Design Principles; also 5.1 Effective Process Measures
Defining KPIs During Process DesignStart from the goal: the strategic or customer goal the process serves. Set the process objective: what the process must achieve, end to end. Choose a few end-to-end KPIs: balanced across time, cost, quality and flexibility. Set baselines and targets: today's value from analysis; the target the design aims for. Design the data capture: where in the flow each measure is recorded, and by what. Assign owners and reviews: who reviews which KPI, how often, and what happens next1Start from the goal2Set the process objective3Choose a few end-to-endKPIs4Set baselines and targets5Design the data capture6Assign owners and reviews

At a glance

  1. Start from the goal — the strategic or customer goal the process serves
  2. Set the process objective — what the process must achieve, end to end
  3. Choose a few end-to-end KPIs — balanced across time, cost, quality and flexibility
  4. Set baselines and targets — today's value from analysis; the target the design aims for
  5. Design the data capture — where in the flow each measure is recorded, and by what
  6. Assign owners and reviews — who reviews which KPI, how often, and what happens next

Why define KPIs during process design?

A redesigned process is built to achieve something: faster decisions, fewer errors, lower cost. Without measures and targets, nobody can tell whether it does. Defining KPIs during process design closes that gap in four ways:

  • The design becomes testable. A pilot can be judged against targets instead of impressions.
  • Measurement is built in. The points where data is captured are designed into the flow and the systems, instead of being retrofitted later at higher cost.
  • The owner can manage from day one. The process owner has agreed measures and targets at go-live, rather than waiting months for a reporting project.
  • Benefits can be shown. Baselines from analysis and targets in the design are the basis for benefits realization.

Measures and targets are therefore among the items a design needs before sign-off, alongside roles, rules and data. Training plans and system choices matter for implementation, but they do not tell anyone whether the design works.

KPIs belong in process design because a process that cannot be measured from the start cannot be managed or improved.

How do you derive process KPIs from goals?

Good process KPIs are traced from goals, not chosen from a list of available reports. A common chain:

  1. Organizational or customer goal, for example retaining customers at renewal.
  2. Process objective: what this process must achieve to support the goal, such as renewal offers that are on time and correct.
  3. End-to-end KPIs: a few indicators of whether the process meets its objective, measured from the customer's trigger to the outcome.
  4. Supporting metrics: step-level or diagnostic measures that explain movements in the KPIs.
  5. Targets and baselines: the current value from analysis and the value the design aims for.

Rummler and Brache described performance at the organization, process and job levels, with measures at each level linked to the one above. The Balanced Scorecard applies a similar idea at the strategic level.

Process KPIs are effective when each one can be traced back to a goal the organization actually cares about.

What makes a good process KPI?

Useful process KPIs share a few properties:

PropertyWhat it means
End to endMeasures the whole process, not one department's part of it
BalancedCovers time, cost, quality and flexibility, so that one is not improved at the expense of another
Outcome and leadingCombines results (complaints) with early signals (backlog age)
FewA handful per process, so attention is not spread thin
Captured at sourceRecorded as a by-product of the work, not by extra manual reporting
OwnedEach KPI has someone who reviews it and acts on it

The academic BPM literature often presents time, cost, quality and flexibility as dimensions that trade off against each other in redesign; Dumas and colleagues call them the devil's quadrangle. Balancing them guards against a design that, for example, cuts cycle time by lowering quality.

A good process KPI is end to end, balanced, captured by the work itself and owned by someone who will act on it.

What does defining KPIs during design look like in practice?

Harbourside Council is redesigning its bulky-waste collection service. Residents book a collection; the council's goal is a clean, responsive neighborhood service at controlled cost.

Before the design is signed off, the team adds:

  • End-to-end KPIs: days from booking to collection; percentage of collections completed on the booked day; cost per collection.
  • A quality signal: missed-collection complaints per thousand bookings.
  • Baselines from the analysis phase: eleven days and 78% on-time.
  • Targets: five days and 95% on-time within six months of go-live.
  • Data capture: the booking form records the request time; crews confirm each collection on a handheld device at the address.
  • Ownership: the waste-services manager reviews the KPIs monthly with the contractor.

During the pilot in two districts, on-time completion reaches 93% but cost per collection rises. The design is adjusted to group bookings by street before rollout.

Defining KPIs during design turned the pilot into a test with clear pass criteria rather than a matter of opinion.

What are common mistakes when defining KPIs during design?

Hammer described seven recurring faults in performance measurement, among them choosing measures that make managers look good, letting departmental boundaries set the measures, measuring from the organization's view rather than the customer's, and ignoring how a measure will change behavior. In process design, they appear as:

  • Departmental KPIs only. Each team gets its own measure, and nobody measures the end-to-end result.
  • Activity counts. Numbers of cases handled or forms processed, which rise without telling anyone whether customers are served better.
  • No baseline. Targets set without knowing today's value cannot show improvement.
  • Unmeasurable KPIs. Indicators that the new design captures nowhere, discovered after go-live.
  • Too many KPIs. Dozens of measures that dilute attention and are never reviewed.
  • Targets that drive the wrong behavior. A target on speed alone invites rushed, poor-quality work.

These mistakes are cheaper to fix on paper than in a running process.

KPIs defined during design avoid these faults when they are few, end to end, baselined, captured in the flow and balanced across dimensions.

What are the limitations of defining KPIs during design?

Building KPIs into design makes a process testable and manageable from day one. Its limits are worth stating:

  • Targets are estimates. Before the process runs, targets rest on analysis and simulation; pilots often show they need adjustment.
  • Some effects are hard to measure. Customer trust, staff morale or risk avoided may need proxy measures or periodic surveys.
  • Measures change behavior. Any KPI, once published, shapes what people do, and some side effects only appear in operation.
  • KPIs need data and review. A measure that no one reviews, or that depends on unreliable data, adds reporting work without value.

These limits argue for reviewing KPIs after the pilot and periodically afterwards, not for leaving them out of design.

Defining KPIs during process design is a starting point for performance management, refined once the process runs.

Defining KPIs in design vs. process performance management: what is the difference?

KPIs in designProcess performance management
WhenBefore the future process is approved and builtWhile the process runs, continuously
Main questionHow will we know whether this design works?How is the process performing, and what should we do about it?
OutputsKPIs, targets, baselines, data-capture points, ownersDashboards, reviews, corrective actions, updated targets
Led byDesign team with the process ownerProcess owner and process manager

Defining KPIs in design prepares the ground; process performance management uses those measures every day and refines them over the life of the process.

Exam focus

Defining KPIs during design belongs to BPM CBOK® knowledge area 4 and to the CBPP® 2026 blueprint sub-area Process Design Principles (4.1), with links to Effective Process Measures (5.1). Expect scenarios in which a design team is about to sign off a redesign and must choose what is still missing. The common trap is an implementation item such as a training schedule or a vendor list instead of measures and targets linked to the goals. Practise in the Process Design & Transformation drill.

Practise this CBPP® blueprint area →

FAQ

When should process KPIs be defined?

During process design, before the future process is approved. At that point the team knows the goals, has a baseline from analysis and can design where data will be captured. KPIs defined only after go-live are often hard to measure and come too late to judge a pilot.

How many KPIs should a process have?

Usually a handful of end-to-end KPIs, often three to five, balanced across time, cost, quality and flexibility, supported by more detailed metrics used for diagnosis. Practice varies, but long lists of KPIs dilute attention and are rarely reviewed.

What is the difference between a KPI and a target?

A KPI is the indicator itself, such as days from booking to collection. A target is the value the process aims for on that indicator, such as five days. A baseline is the current value. Design needs all three to show whether a change has worked.

Why are end-to-end process KPIs important?

Because departmental measures can all look good while the customer's experience of the whole process is poor. End-to-end KPIs measure from the customer's trigger to the outcome, so delays and errors in handoffs between departments become visible and someone is accountable for them.

Sources

Last reviewed

CBPP®, CBPA®, CBPL® and BPM CBOK® are registered marks of the Association of Business Process Management Professionals International (ABPMP). Other names may be trademarks of their respective owners. This guide is independent and is not affiliated with, endorsed by or sponsored by ABPMP International or any of its chapters and affiliates, including ABPMP Brasil and France Processus. Its practice questions are original and are not taken from any ABPMP exam.